Excavator operation technical process

Release date:2015-09-14 00:00 Source:http://www.ahxdwj.com Views:

Anhui excavator to introduce the technical process of the excavator operation:

One, the examination qualified and hold the equipment operation certificate, the party must carry out the operation. Operators must strictly comply with the relevant safety, transfer and other systems.

Two, before the work in strict accordance with the provisions of the steering lamp, walking, braking and power output and other parts of the site should be carefully checked, adjust, strong, lubrication, after the trial run to confirm the good work.

Three, without the tunnel foreman and tunnel safety confirmation, shall not use mechanical equipment in the construction site

Four, the crew should understand the excavation height, depth, slope, height, size of wire cable, underground pipelines, unexploded hole, tunnels and other obstacles, mechanical approach, site should follow the command, if not found unsafe when solved, drivers have the right to refuse.

Five, each bucket digging eat soil should not be too deep, the bucket is not excessive.

Six, to dump the car when waiting for the bus stop leave then unloading, unloading should be as small as possible, to prohibit any part of the bucket from the cab and the car collision over the top

Seven, when the bucket is not leaving the work table, with a bucket of the excavator is prohibited to rotate, the working table of side impact or bucket side scraping soil not in excavator rotation.

In eight, high on the working table of mining powder soil, should be larger stones in the work table and other debris removed, so as to avoid the collapse of the accident; if the soil dug into the suspended state but not the natural collapse, using artificial processing, shall not use the bucket press, banned in the face of danger here work or parked excavator.

Nine, the mobile excavator itself should not be a large distance (5 km), moving the arm should be placed in the direction of walking, the bucket height of not more than 1 meters, the bucket full ban mobile. The driving wheel should be in the back of the hill, and the boom should be in the front. Prohibited in the slope, and the transmission and rotary body sliding. Under no more than 20 degrees slope section, by rail or excavator in soft soil, clay ground, should be laid plate.

Ten, transport excavator, prohibited steering and stopping for no reason in the springboard, the car should check the brakes, put the arm and bucket

Eleven, when the excavator at work to prohibit the high speed and turn, in the construction must ensure that personnel, machinery and equipment and construction safety.

Twelve, after the machine shall be left in a safe working area, flat solid place. The fuselage will be positive, and the bucket floor, all the lever in the neutral position, all brake brake die, turn off the engine (winter cooling water should be put in the net), in accordance with the provisions of the maintenance regulations, do a routine maintenance, locking the doors and windows before leaving.

Thirteen, prohibited the use of the equipment for two handling, handling and other non-standard operations, except for special reasons; but we should take the following measures:

1 must take safety protection measures to ensure that personnel, equipment safety.

2 site must be directed at operations, otherwise the operator can not perform.

Fourteen, the driver should be careful to fill in the running records, the monthly delivery of the machine room inspection.

Fifteen, in the maintenance should be a warning sign, it is forbidden to start any person.